NERC Moves to Defer Reliability Standards, Provide COVID-19 Flexibility

The North American Electric Reliability Corporation (NERC) has asked the Federal Energy Regulatory Commission (FERC) to delay the implementation of seven reliability standards that relate to cybersecurity, training, disturbance monitoring and reporting, generator relay loadability, and coordination of protection systems for performance during faults. In an April 6 filing to FERC, NERC noted the rules were scheduled to become effective later this year, but, as NERC noted, their implementation could be hampered by “significant uncertainties” regarding the duration of the COVID-19 outbreak and recovery.

 

Source : https://bit.ly/3efpMf7



This entry was posted in : flexibility